Work Breakdown Structure for a Wedding
(Individual project)
Overview
The purpose of this Individual assignment is to develop a WBS (Work Breakdown Structure). NOTE: You
will need Microsoft Project for this assignment. Since this will be an introduction to Microsoft Project,
the scope of the WBS is relatively small.
Assignment for the Wedding WBS
The scenario is this – Your best friend asked you to help plan a wedding in another city. You have no
concern for schedule or budget at the moment, only defining the work that needs to be done for the
wedding to start on time and to be successful. There will be up to 100 guests.
As there are different ways to organize a WBS, you should choose one of the patterns below. This WBS
can be organized by functions or by physical locations, choose just one. Of course, there are other
patterns that could be used but these look like logical choices for this project.
WBS Organized by Location
Level
WBS Organized by Function
WBS Element
Level
WBS Element
0
The wedding project
0
The wedding project
1
Airport arrangements
1
Event programming
1
Guest hotels
1
Guest arrangements
1
Church arrangements
1
Catering
1
Reception arrangements
1
Musical entertainment
1
Wedding outfits
1
Floral displays
1
Going away outfits
1
Wedding outfitting
1
Honeymoon arrangements
1
Transportation
Things to remember:

First, change the MS-Project default configuration settings, see the Project Configuration
Settings section in “Project Tutorials” (Course Resources → Microsoft Project).

Don’t go overboard on details, i.e., no need to go deeper than WBS Level 3.

Even though this is a small project, make sure you have enough details, i.e., enough sub-tasks to
show how you will complete the Summary Task deliverable.

Do indent sub-tasks, see the Adding Tasks to the Schedule section in “Project Tutorials” (Course
Resources → Microsoft Project).

Show the WBS column, see Show the Project WBS Numbers section in “Project Tutorials”
(Course Resources → Microsoft Project).
WBS for a Wedding Fall 2021
Page 1 of 2
Work Breakdown Structure for a Wedding
(Individual project)

Follow task naming conventions, see “How to Build Work Breakdown Structures” (Week 1 →
Readings)
o
A sub-task should be named using verb, adjective and noun – there is action performed.
o
A Summary task should be named using noun / adjective structure (NO VERBS) – it
describes what will be delivered instead of what work will be done.

No blank rows, i.e.,

Summary tasks and sub-tasks should address only one (not multiple) deliverable (or action).

Never use full sentences in the Task Name column of the schedule.
IMPORTANT: The submission file should be named as “LastnameFirstname AssignmentName”, such as MylastnameMyfirstname WBS for a Wedding.mpp
Grading Rubric
90-100%
80-89%
70-79%
60-69%
< 60% Far Above Standards Above Standards Meets Standards Below Standards Well Below Standards Criteria Configuration Settings 18-20 Points 16-17 Points 14-15 Points 12-13 Points 0-11 Points Needed for producing consistent results in the project schedule All configuration settings correct Missed 1-2 configuration settings Missed 3-4 configuration settings Missed 4-5 configuration settings Missed 5 or more configuration settings WBS Structure 18-20 Points 16-17 Points 14-15 Points 12-13 Points 0-11 Points Includes appropriate level of decomposition, uses Project's WBS numbering, requires indenting sub-tasks, and continuous rows Correctly decomposed the schedule to Outline Level 3; Did not leave blank rows in the schedule; Did not manually enter WBS numbers Decomposed too little (to Outline Level 2), or too much (to Outline Level 4) Over-decomposition (to Outline Level 5) Far too much decomposition, beyond Outline Level 5 No decomposition at all, stopped at Outline Level 1; Left blank rows in the schedule; Manually entered WBS numbers Summary Tasks 27-30 Points 24-26 Points 21-23 Points 18-20 Points 0-17 Points Uses a specific naming convention, refers to a single deliverable, does not read like a sentence All Summary Tasks follow the correct naming structure; Summary Tasks do not use full sentences in the Task Name column; Summary Tasks do not encompass multiple deliverables At least two sources are 1-2 Summary Tasks do not follow correct naming structure; 1-2 Summary Tasks use full sentences in the Task Name column; 1-2 Summary Tasks encompass multiple deliverables (should only be one) 3-4 Summary Tasks do not follow correct naming structure; 3-4 Summary Tasks use full sentences in the Task Name column; 3-4 Summary Tasks encompass multiple deliverables (should only be one) 5-6 Summary Tasks do not follow correct naming structure; 5-6 Summary Tasks use full sentences in the Task Name column; 5-6 Summary Tasks encompass multiple deliverables (should only be one) 7 or more Summary Tasks do not follow correct naming structure; 7 or more Summary Tasks use full sentences in the Task Name column; 7 or more Summary Tasks encompass multiple deliverables (should only be one) Sub-Tasks 27-30 Points 24-26 Points 21-23 Points 18-20 Points 0-17 Points Uses a specific naming convention, refers to a single action, does not read like a sentence All sub-tasks follow correct naming structure; Sub-tasks do not use full sentences in the Task Name column; Subtasks do not encompass multiple actions 1-2 sub-tasks do not follow correct naming structure; 1-2 sub-tasks use full sentences in the Task Name column; 1-2 sub-tasks encompass multiple actions (should only be one) 3-4 sub-tasks do not follow correct naming structure; 3-4 sub-tasks use full sentences in the Task Name column; 3-4 sub-tasks encompass multiple actions (should only be one) 5-6 sub-tasks do not follow correct naming structure; 5-6 sub-tasks use full sentences in the Task Name column; 5-6 sub-tasks encompass multiple actions (should only be one) 7 or more sub-tasks do not follow correct naming structure; 7 or more subtasks use full sentences in the Task Name column; 7 or more sub-tasks encompass multiple actions (should only be one) WBS for a Wedding Fall 2021 Page 2 of 2 Possible Points 20 20 30 30 Purchase answer to see full attachment