Description
I did a co-op training in a consulting company in construction and this report should have a summary about the company’s roles and what did i do as a mechanical engineer in the construction site the report have to be between 30 to 40 pages i will provide a sample report and some of the things i worked on, below is the company website so you can write a brief about it https://www.mabconsult.com.sa/
Unformatted Attachment Preview
NOTES:
1.
ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS
UNLESS NOTED OTHERWISE. ALL DIMENSIONS
TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
2.
THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER
RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL,
ELECTRICAL AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS
OF THE SPECIFICATION.
3.
THE CONTRACTOR TO VERIFY EXISTING CONDITIONS AND
DIMENSIONS ON THE SITE PRIOR TO START OF ANY WORK.
4.
ANY DISCREPANCY ARISING IN PROPOSED WORK A NECESSARY
ADJUSTMENT SHALL BE DONE WITH THE APPROVAL OF MAB
CONSULT ENGINEER OR REPRESENTATIVE PRIOR TO
IMPLEMENTATION OF WORKS.
KEY PLAN
N
REFERENCE DRAWINGS
DRAWING CODE
DRAWING TITLE
SHEET NO.
CLIENT NAME:
Australian Laboratory Services Arabia Co. Ltd
PROJECT LOCATION:
DAMMAM, KINGDOM OF SAUDI
ARABIA
DESIGNER:
DESIGN CONSULTANT
Project Management Architecture Engineering
PROJECT NAME:
ALS Arabia Laboratory Building
DRAWING TITLE :
A
SITE 3D VIEW
NAME
1
–
SITE 3D VIEW
SCE PROFESSION
REG. NO. SIGNATURE
DESIGNED BY:
CHECKED BY:
APPROVED BY:
SHEET SIZE
SCALE
JOB NO.
DRAWING CODE
SHEET NO.
A1
1:100 M.
PO-215
DD-ALS-B01
AR-00A
+966508877242
Salt Al-Bahar Glass House AC Design Re-study and Comparrison prior for Adaptation
System description
Manufacturer
BOQ
Cost comparison
Maintainans
Design cost
Ashrae equipment Life chart
expectation
Area and space issues
Energy efficiency class
Option 1
Option 2
Original Design
New Proposal
Vrf system with concealed type fcu with copper refrigerant piping
Packaged type ac unit with ducting exterior and interior
Daikin
Zamil / Carier / Trane / LG
1. VRF outdoor unit – 3 Units/System
1. Packaged Type AC Outdoor Unit
2. Concealed FC slim Type -2 TR
Dining Area – 24 TR capacity
Dining Area – 12 Units
Kids Club – 14 TR capacity
Kids Club – 7 Units
2. Ducting System and insulation
3. High Wall Mounted
3. Clading/Louver/Jet Diffuser
Prayer Room – Men & Women – 2 Units
3. High Wall Mounted
Bar Preparation – 2 Units
Prayer Room – Men & Women – 2 Units
4. Refrigerant Piping with Y connector
Bar Preparation – 2 Units
5. Testing and Commissioning
4. Refrigerant piping (Prayer room and Bar area)
Payment plan.
5. Testing, Commissioning, and Air Balancing
10% – Study and design the plan
( SOW )
30% – When requesting the supply and installation of the ductwork
1-Air conditioning units must be drained individually with a single pipe.
55% – When requesting the supply and installation of air conditioning
2-The diameter of the drainage pipe must not be less than 1 inch, and the length of the drainage pipe must not exceed
machines
10 M
5% – When requesting the supply and installation of grills
3-Water drainage for machines is connected to the nearest drainage point in the location.
(SOW)
4- The duct is manufactured from a white galvanized sheet of excellent quality and is manufactured according to plans.
1- Connecting the refrigerant suction and expulsion pipes to the air
5- The duct is insulated with glass wool and covered with a layer of aluminum produced by the AFICO factory, with a
conditioning unit using a filler method, according to the applicable technical density of (24 kg/cubic meter) and a thickness of 1 inch for the duct located inside the building, and (AFICO) with a
principles
density of (48 kg/cubic meter) and a thickness of two inches for the existing duct. Outside, the external duct is covered
2- Bending copper pipes is done using a zipper or using a pipe bender to
with glue and building cloth, and the insulation is tied with special strips for this purpose, provided that the distance
measure each diameter
between one clamp and the other does not exceed 30 cm: 40 cm. This is done after applying a special paste to all
3-Air conditioning units must be paved individually with a single pipe, and
connections.
the paving slopes must not be less than 1 cm per linear meter.
6- All air outlet boxes are insulated with thermal and sound-deadening panels (KIMICO) and attached using screws and
4-The diameter of the drainage pipe must not be less than 1 inch, and the
special glue for that purpose. The insulation panels are (KIMICO) with a thickness of 1 inch.
length of the drainage pipe must not exceed 10 meters.
7- (FLEXIBLE) will be supplied and installed to connect it to the air collection boxes.
5- The water drainage for the machines is connected to the nearest drainage 8- Flexible connections are installed between the main air ducts and air conditioning devices to prevent vibrations
point on site
9- The duct is hung with solid skewers and painted corners, and accessories are installed inside the duct work,
including (SPLITER DUMBER) and (VOLUME DUMBER) and everything necessary according to the plan.
10- RUBBER is placed with appropriate thickness under the air conditioners to prevent vibrations
11- Air outlets and grills are supplied and installed from pure aluminum painted with white paint according to the
drawings.
(Payment plan)
10% – Study and design the plan
30% – When requesting the supply and installation of the ductwork
55% – When requesting the supply and installation of air conditioning machines
5% – When requesting the supply and installation of grills
1. Servicing on call – ONE week before
2.Complex installation and maintenance
Done
10 – 15 years
1. Servicing on call – baised on the manufacturer/ brand
2.Easy maintenance
To be design
10 to 16 years, with an average of 14 years
Concealed FCU’s to validate sizing inside ceiling requirement but for the
outdoor VRF are ok with the spaces
Ducting size per airflow need to validate and design to provide.
For the outdoor packaged type AC would require more space and area to accommodate a 14 TR and 22 TR AC ODU.
A well-designed VRF system may be marginally higher in first cost, but will
have significantly lower annual energy cost and provide greater comfort
when compared to traditional packaged units.
Low Energy efficiency compere to VFR system
Design Drawings
Advantage
Disadvantage
Price
Estimated delivery time
Rocommendation
Energy efficient
Zoning capability
Flexible installation
Quiet operation
Higher initial cost
Complex installation and maintenance
Limited capacity per indoor unit
250,000 SAR / VAT NOT INCLUDED
Lower initial cost
Easy maintenance
Suitable for small to medium-sized spaces
Limited zoning capability
Less energy efficient
Noisy operation
Carrier:224,000 – Daikin:219,500 – York:230,500 / VAT NOT INCLUDED
Salt Al-Bahar Glass House AC Design Re-study and Comparrison prior for Adaptation
System description
Manufacturer
BOQ
Cost comparison
Maintainans
Design cost
Ashrae equipment Life chart
expectation
Area and space issues
Energy efficiency class
Option 1
Option 2
Original Design
New Proposal
Vrf system with concealed type fcu with copper refrigerant piping
Packaged type ac unit with ducting exterior and interior
Daikin
Zamil / Carier / Trane / LG
1. VRF outdoor unit – 3 Units/System
1. Packaged Type AC Outdoor Unit
2. Concealed FC slim Type -2 TR
Dining Area – 24 TR capacity
Dining Area – 12 Units
Kids Club – 14 TR capacity
Kids Club – 7 Units
2. Ducting System and insulation
3. High Wall Mounted
3. Clading/Louver/Jet Diffuser
Prayer Room – Men & Women – 2 Units
3. High Wall Mounted
Bar Preparation – 2 Units
Prayer Room – Men & Women – 2 Units
4. Refrigerant Piping with Y connector
Bar Preparation – 2 Units
5. Testing and Commissioning
4. Refrigerant piping (Prayer room and Bar area)
Payment plan.
5. Testing, Commissioning, and Air Balancing
10% – Study and design the plan
( SOW )
30% – When requesting the supply and installation of the ductwork
1-Air conditioning units must be drained individually with a single pipe.
55% – When requesting the supply and installation of air conditioning
2-The diameter of the drainage pipe must not be less than 1 inch, and the length of the drainage pipe must not exceed
machines
10 M
5% – When requesting the supply and installation of grills
3-Water drainage for machines is connected to the nearest drainage point in the location.
(SOW)
4- The duct is manufactured from a white galvanized sheet of excellent quality and is manufactured according to plans.
1- Connecting the refrigerant suction and expulsion pipes to the air
5- The duct is insulated with glass wool and covered with a layer of aluminum produced by the AFICO factory, with a
conditioning unit using a filler method, according to the applicable technical density of (24 kg/cubic meter) and a thickness of 1 inch for the duct located inside the building, and (AFICO) with a
principles
density of (48 kg/cubic meter) and a thickness of two inches for the existing duct. Outside, the external duct is covered
2- Bending copper pipes is done using a zipper or using a pipe bender to
with glue and building cloth, and the insulation is tied with special strips for this purpose, provided that the distance
measure each diameter
between one clamp and the other does not exceed 30 cm: 40 cm. This is done after applying a special paste to all
3-Air conditioning units must be paved individually with a single pipe, and
connections.
the paving slopes must not be less than 1 cm per linear meter.
6- All air outlet boxes are insulated with thermal and sound-deadening panels (KIMICO) and attached using screws and
4-The diameter of the drainage pipe must not be less than 1 inch, and the
special glue for that purpose. The insulation panels are (KIMICO) with a thickness of 1 inch.
length of the drainage pipe must not exceed 10 meters.
7- (FLEXIBLE) will be supplied and installed to connect it to the air collection boxes.
5- The water drainage for the machines is connected to the nearest drainage 8- Flexible connections are installed between the main air ducts and air conditioning devices to prevent vibrations
point on site
9- The duct is hung with solid skewers and painted corners, and accessories are installed inside the duct work,
including (SPLITER DUMBER) and (VOLUME DUMBER) and everything necessary according to the plan.
10- RUBBER is placed with appropriate thickness under the air conditioners to prevent vibrations
11- Air outlets and grills are supplied and installed from pure aluminum painted with white paint according to the
drawings.
(Payment plan)
10% – Study and design the plan
30% – When requesting the supply and installation of the ductwork
55% – When requesting the supply and installation of air conditioning machines
5% – When requesting the supply and installation of grills
1. Servicing on call – ONE week before
2.Complex installation and maintenance
Done
10 – 15 years
1. Servicing on call – baised on the manufacturer/ brand
2.Easy maintenance
To be design
10 to 16 years, with an average of 14 years
Concealed FCU’s to validate sizing inside ceiling requirement but for the
outdoor VRF are ok with the spaces
Ducting size per airflow need to validate and design to provide.
For the outdoor packaged type AC would require more space and area to accommodate a 14 TR and 22 TR AC ODU.
A well-designed VRF system may be marginally higher in first cost, but will
have significantly lower annual energy cost and provide greater comfort
when compared to traditional packaged units.
Low Energy efficiency compere to VFR system
Design Drawings
Advantage
Disadvantage
Price
Estimated delivery time
Rocommendation
Energy efficient
Zoning capability
Flexible installation
Quiet operation
Higher initial cost
Complex installation and maintenance
Limited capacity per indoor unit
250,000 SAR / VAT NOT INCLUDED
Lower initial cost
Easy maintenance
Suitable for small to medium-sized spaces
Limited zoning capability
Less energy efficient
Noisy operation
Carrier:224,000 – Daikin:219,500 – York:230,500 / VAT NOT INCLUDED
NOTES:
1.
ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS
UNLESS NOTED OTHERWISE. ALL DIMENSIONS
TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
2.
THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER
RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL,
ELECTRICAL AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS
OF THE SPECIFICATION.
3.
THE CONTRACTOR TO VERIFY EXISTING CONDITIONS AND
DIMENSIONS ON THE SITE PRIOR TO START OF ANY WORK.
4.
ANY DISCREPANCY ARISING IN PROPOSED WORK A NECESSARY
ADJUSTMENT SHALL BE DONE WITH THE APPROVAL OF MAB
CONSULT ENGINEER OR REPRESENTATIVE PRIOR TO
IMPLEMENTATION OF WORKS.
KEY PLAN
N
REFERENCE DRAWINGS
DRAWING CODE
DRAWING TITLE
SHEET NO.
CLIENT NAME:
Australian Laboratory Services Arabia Co. Ltd
PROJECT LOCATION:
DAMMAM, KINGDOM OF SAUDI
ARABIA
DESIGNER:
DESIGN CONSULTANT
Project Management Architecture Engineering
PROJECT NAME:
ALS Arabia Laboratory Building
DRAWING TITLE :
A
SITE 3D VIEW
NAME
1
–
SITE 3D VIEW
SCE PROFESSION
REG. NO. SIGNATURE
DESIGNED BY:
CHECKED BY:
APPROVED BY:
SHEET SIZE
SCALE
JOB NO.
DRAWING CODE
SHEET NO.
A1
1:100 M.
PO-215
DD-ALS-B01
AR-00A
0123456247956511651415
65471
094656521
1
“””””
!
“”””””
#$%
&'(‘) ,42-.,//. -010 -012-
344
*’!&+
“””””
$
“”””””””
5)667
*”)6′)
89
9
0 8 !
“#”$%&'(7”)###########################################################################################################################*
“#”#”$%&’+7”,&-7##############################################################################################################*
“#”#.$%&'(7”)/017)###########################################################################################################2
“#.$35)(7”)##########################################################################################################################4
“#5$+5/76+7”)###########################################################################################################################4
“#5#”$-765675)78)##############################################################################################################4
“#5#.$+5/76(7”95)./017)###############################################################################################4
:;? @
.#”$3%A3167B7))###################################################################################################################C
.#.$3%A3D5&87EF&1D78/###################################################################################################”G
.#5$3%A3367B7))H’7(I&5665D########################################################################################””
J99> 9>K00
LMNO&7P&8367Q7B/)################################################################################################################”.
LMRS78P/&7P&8367Q7B/)#########################################################################################################”.
>KT90
U#”$VWX################################################################################################################################”5
U#.$I7)&68############################################################################################################################”5
U#.#”$3YZI[3&17YZ8)/6FD78/)I&5665D######################################################################”5
U#.#.$AZA[A5-7/0Z8)/6FB/&78A977/#################################################################################”]
U#.#5$3’58Y167-&’7##########################################################################################################”4
U#.#U$3&1&863’58###############################################################################################################”C
U#.#*$Z)7D7/6&B^&7(########################################################################################################.G
U#.#]$H7F8_5/&783’58#######################################################################################################.”
U#.#2$ÌO%^Aa%`########################################################################################################.”
U#.#4$A/67))b85’0)&)X7176/#############################################################################################..
U#5$V78)/6FB/&78###################################################################################################################.5
U#U$V7DD&))&78&86##############################################################################################################.5
U#*$ÌVV###############################################################################################################################.U
023567
89 99999999999999999999999999999999999999999999999999999999999999999908
37757!7″
“#5$%7″&
“#5$%7’5()*(+(“&
“,#5$%7+-7”.
“/0!16725$$’5!3(6″4
,5365,7
89999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999:;
< =>999999999999999999999999999999999999999999999999999999999999999999999999999999999999999999:0
?@99999999999999999999999999999999999999999999999999999999999999999999999999999999999999999:A
B+7#+,/
C (+5+D*17,
B*”7!E!5((6$5(,&
FG$75!((6C *!7,.
023567
89
75756657777577
55!55!7″7!7!575#7″”7!$!%77″7775!
5!5&’5755!76775675$5’57755
“!!$77″5!$77(77%%65775)7
5″”5!75757755!767765!5!$&*7)7+
‘557!75$)7$7&,77+%6
7″5!!$7757!77″767577!7557
755!76776777!775!7!$67565
7577-5.!/7553!50-./3177$!!77557
65+$!5575″75!!76)777577″7$5
757&277%!767″$756/’..
3/40/7’75.!.75375!/7571″5677865
957!
$865!!7!!57&7)7+775″56577
!!7)7&
023567
/01234561730
8+59):;8+5897+=)5>:=?):9@5>AB=C5>5,=:>5?):9@5>A5>D:>7:E,*7?5+67C,
):9@5>=7C:>,*7F:+?DE+:9@+:DG),=:>5>D+7H7>G75C@7),C-8+59):*5C7C,5
Purchase answer to see full
attachment