ADMN 1206 T 24W – Charles Mensah

Description

Step
Instructions
Points
1

Don't use plagiarized sources. Get Your Custom Assignment on
ADMN 1206 T 24W – Charles Mensah
From as Little as $13/Page

Open the file named Student_PowerPoint_3G_Remodels.pptx downloaded with this project.

0
2

Change title of presentation to Backyard and Home Remodels and the subtitle to The Backyard and Home View.

2
3

Change the Colors for the presentation to Median.

3
4

On Slide 1, format the background with the Stationery texture, and then change the Transparency to 30%.

6
5

Select Slides 2 through 4, and then apply a Solid fill to the background of the selected slides-in the fifth column, the third color.

6
6

On Slide 2, hide the background graphics.

4
7

On Slide 2, insert a Table with 2 columns and 4 rows. Apply table style Medium Style 3-Accent 1, and then type the information below in the inserted table.

Row 1, Col 1: Improvement Type; Col 2: Components

Row 2, Col 1: Outdoor Kitchen; Col2: Barbecue, sink, bar, covered patio

Row 3, Col 1: Swimming Pool; Col 2: Jacuzzi, pool, waterfall

Row 4, Col 1: Fire Pit; Col 2: Fire pit, seating area, gas lines

10
8

Change the Font Size of all of the table text to 28. Resize the table height to 5.8″, and then distribute the table rows. Align the table text so that it is centered horizontally and vertically within the cells.

8
9

In the table, change the Font Size of the first row of text to 32. Apply a Round style Cell Bevel to the first row. Note, depending on your version of PowerPoint, this may be called Circle.

6
10

On Slide 3, animate the picture using the Wipe entrance animation starting After Previous. Change the Duration to 01.00. Apply the Split entrance animation to the bulleted list placeholder, and then change the Effect Options to Vertical Out.

8
11

On Slide 4, insert a Clustered Column chart. In the worksheet, beginning in cell B1, type the following data.

In row 1, beginning in cell B1: Owner Installed, Contractor, Owner as Contractor

In row 2, beginning in cell A2: Patio, 8000, 12000, 9500

In row 3, beginning in cell A3: Bar, 3500, 5200, 4600

In row 4, beginning in cell A4: Infrastructure, 5000, 9750, 8100

In row 5, beginning in cell A5: Appliances, 3000, 4200, 3850

11
12

Apply Chart Style 8 to the chart, and then remove the Chart Title element. Apply the Wipe entrance animation to the chart and change the Effect Options to By Series.

8
13

On Slide 5, format the background using a solid fill, the first color in the fourth column, and hide the background graphics. Change the font color of the text to the first color in the first column. From your downloaded project files, insert the video p03G_Video1.mp4.

6
14

Change the Video Height to 5 and use the Align Center and Align Middle options to position the video. Apply the Simple Frame, Black video style.

10
15

On the Playback tab, change the Video Options to Start the video Automatically. Trim the video so that the End Time is 00:07 and then compress the media to Standard Quality. (Mac users, the Compress Media feature is not available on a Mac).

6
16

On Slide 6, hide the background graphics, and then format the slide background by inserting a picture from your downloaded grader files-p03G_Backyardv2.jpg. Set the Transparency to 0%

6
17

Insert a Header & Footer on the Notes and Handouts. Include the Date and time updated automatically, the Page number, and a Footer with the text 3G_Remodels

Display the document properties. As the Tags, type backyard remodels

3
18

Save and close the file, and then submit for grading.

Step

Instructions

Points

1

Open the file Student_PowerPoint_7E_Surveys.pptx downloaded with this project.

0
2

On Slide 3, insert a 3-column x 5-row table.

8
3

On Slide 3, in row 1, column 1, type Job Fair in column 2, type Location in column 3, type Minimum Employees

2
4

Type the following information in the corresponding cells, beginning in row 2:

Column 1

Greater Seattle

Bellingham Technology

Shorewood Healthcare

Vancouver Paints

Column 2

Seattle

Bellingham

Shorewood

Vancouver

Column 3

500

20

100

75

5
5

Center the text in the Header Row.

2
6

Apply the Medium Style 3 – Accent 1 design to the table.

4
7

On Slide 3, AutoFit column 2. Set the width of column 3 to 2.5″. Center the text in column 3.

4
8

Set the table alignment on the slide to Align Center and Align Middle.

5
9

Open the downloaded p07E_Staffing_Survey.xlsx workbook. Copy the Excel cell range A1:D9, and then paste it on Slide 4, using destination styles.

8
10

In the table on Slide 4, delete column 4. Lock Aspect Ratio and change the table width to 8″.

4
11

Move the table up so it is aligned on the upper half of the vertical ruler at 0.75 inch. Set the alignment to Align Center.

6
12

Select the Header Row check box.

3
13

Split the Advertising/Public Relations cell into two columns. In the new cell, type Public Relations In the original cell, delete /Public Relations. Split the Engineering/Architect cell into two columns. In the new cell, type Architect In the original cell, delete /Architect.

4
14

Select the table, and then change the Font to Arial and Font Size to 16. Center the text in column 3. Center the text in row 1, and then increase the Font Size of the text in row 1 to 20.

10
15

In Word, open p07E_New_Hires.docx. Copy the table, and then paste it on Slide 5, using destination styles.

8
16

Delete the Location column. Lock the Aspect Ratio, and then increase the table width to 7.5″. Change the font size of the table to 18. AutoFit column 1 and column 2. Center the text in column 3.

6
17

Move the table up so it is aligned on the upper half of the vertical ruler at 1 inch. Set the alignment to Align Center.

5
18

Remove the shading from the first column.

2
19

Add a Section Header slide between Slides 2 and 3. On the new Slide 3, enter the title Job Fair Data and the subtitle Seattle-Tacoma Job Fair

6
20

Add a Section between Slides 2 and 3 and rename the section Job Fair Data

6
21

Insert a footer on the notes and handouts that includes a fixed date and time, the page number, and 7E_Surveys. Display the document properties, and as the Tags, type survey, industry

2
22

Save and close the file, and then submit for grading.